- 7,744
- 154
- 63
- Location
- Columbus Georgia
Holy Crap - seems like this is taking forever for me.
Can only work on it about 2 to 3 hrs a day due to medications but we're back on a roll again.
I have not filled the brake system yet and most likely will be towards the end this step takes place so hang in there because DOC will finally have something with real brakes operable on it.
The side you see was all previously touched and wacked out of shape - getting it back into at lease somewhat of a flat condition - Doc will probably take a hammer to it because he dislikes anything that looks like is has been straightened.
I have a couple more days at least on this side before getting to the other side - one of the CAMO members dropped off his 2008 Harley Softail which is getting a new starter in it and also polished up when its done.
Can only work on it about 2 to 3 hrs a day due to medications but we're back on a roll again.
I have not filled the brake system yet and most likely will be towards the end this step takes place so hang in there because DOC will finally have something with real brakes operable on it.
The side you see was all previously touched and wacked out of shape - getting it back into at lease somewhat of a flat condition - Doc will probably take a hammer to it because he dislikes anything that looks like is has been straightened.
I have a couple more days at least on this side before getting to the other side - one of the CAMO members dropped off his 2008 Harley Softail which is getting a new starter in it and also polished up when its done.