- 3,571
- 3,475
- 113
- Location
- Brooklyn, NY
I will be starting several separate threads soon.
Three of four EUC given at one time.
Two M1114’s and one of two M1151’s are now granted EUC’s.
One purchase Jan 20 and the other two roughly March 07, 2024. Await EUC M1151 paid for April 5’ish.
The M1114’s are missing tops and doors and B-pillars. The M1151’s are missing doors.
Plans are home-made Aluminum flying nun tops for M1114 and home made doors for everything. (Man makes plans, God laughs.)
Three of four EUC given at one time.
Two M1114’s and one of two M1151’s are now granted EUC’s.
One purchase Jan 20 and the other two roughly March 07, 2024. Await EUC M1151 paid for April 5’ish.
The M1114’s are missing tops and doors and B-pillars. The M1151’s are missing doors.
Plans are home-made Aluminum flying nun tops for M1114 and home made doors for everything. (Man makes plans, God laughs.)
Last edited: