Thank you for the offer I really do appreciate it. But since sewerzuk has already figured out the conversion and has put to the test, I will just wait for him to post the conversion. Im doing the conversion as a favor for my buddy and am not making anything for my time. I will probably get some...
Sewerzuk, is their a chance I could pay you for your time to check mep-006a wire configuration. I need the complete modification asap for my buddy.
thanks
Maybe I should have added, that my friend wants to run the generator continuous for weeks at a time with no interruption. Most generators are not rated for continuos duty cycle like this one.
He has a 1000 gallon subterranean fuel tank and gets his fuel dirt cheap. So cost to run really isnt a...
Thank you both for taking the time to respond. I will hold off on doing the conversion until you publish the control wire reconfiguration. I am doing the conversion for a friend and do not want to risk damaging his genset.
Thanks again
I understand, im sorry if I came off the wrong way. I would need 120/208 which I believe is wye or star low volt configuration. I already know how to convert it from either 120/208 or 240/416. I would be going back and fourth from single to 3 phase often. So a mod like I first mentioned would...
Thanks for all of the Reponses. Ok yes I know for a fact that I have a 30kw load on the main panel for extended periods of time. I have a fluke clamp on current meter which tells me exactly what I have on each 120 volt leg. As for wet stacking I know exactly what it is and have the optional...
conversion
Thanks for the reply, From what I understand the mep 004 and 005 use the same reconnection board, voltage regulator and thermal watt converter. So if I do this mod to my generator then the same could be done to the two smaller generators.
You would think that the mep 006a is kinda...
Has anyone thought about using a 3pdt relay and a couple large contactors,To make switching from single to three phase possible by just flipping a switch.
It can easily be done with relays and contactors with 24 volt coils.The only problem is what if one of the contacts develops a poor...
Do you still have one set of doors left with working locking mechanisms. I need the set of doors which are closest to the main output power terminal board with the split bolts. Im also looking for the safety cover which covers these connections.