- 10,350
- 75
- 48
- Location
- Meadows of Dan, Virginia
Another first from the Meadows of Dan skunk works.
A second FDC was installed to monitor leakage and to serve as a sending unit for a more sensitive Fuel Viscosity Meter.
The FDC on the IP is now bypassed. The second unit, which is the one originally mounted on the Injection Pump, sits on an aluminum box to collect any fuel that might leak from it. It is fully operational, just not affecting the governor.
Time will tell how badly it leaks.
A second FDC was installed to monitor leakage and to serve as a sending unit for a more sensitive Fuel Viscosity Meter.
The FDC on the IP is now bypassed. The second unit, which is the one originally mounted on the Injection Pump, sits on an aluminum box to collect any fuel that might leak from it. It is fully operational, just not affecting the governor.
Time will tell how badly it leaks.
Attachments
-
217 KB Views: 1,410
-
183.2 KB Views: 1,408