M215
Member
- 478
- 3
- 18
- Location
- Spotsylvania, Virginia
Halftrack project UPDATE
Hello SS,
This week marks a turning point in the 2.5 year old halftrack project, actually starting to put it back together!
The newly sand blasted and primed frame re-entered the barn to be positioned on blocking over the rebuilt front axle, jack-shaft and bogie support bracket.
At this point things should come together quickly, all the big stuff is finished, motor, trans / transfer rebuilt, rear suspension parts, new bogies and new tracks ready to go. The goal is to have a rolling running chassis by summer.
WooHoo!
Karl
Hello SS,
This week marks a turning point in the 2.5 year old halftrack project, actually starting to put it back together!
The newly sand blasted and primed frame re-entered the barn to be positioned on blocking over the rebuilt front axle, jack-shaft and bogie support bracket.
At this point things should come together quickly, all the big stuff is finished, motor, trans / transfer rebuilt, rear suspension parts, new bogies and new tracks ready to go. The goal is to have a rolling running chassis by summer.
WooHoo!
Karl
Attachments
-
64.8 KB Views: 377
-
59.9 KB Views: 369
-
68.4 KB Views: 369
-
82.2 KB Views: 383
Last edited: