Gunny65
Member
- 173
- 7
- 18
- Location
- Bonners Ferry, idaho
I want to post a few pics and so forth of my build so far. I started a little while ago but as I am slow, I wanted to get a few areas done to start this.
Here is the truck as I picked it up.
Here is the van extended.
I am taking out the ducting, lights and unnecessary wiring. The A/C ducting takes up about four inches of head room. It did not come with an A/C installed and I didn't want to use the ducting anyway. The florescent lights take way to much energy to run so I will be swapping them with LED lights. The van is setup for 3phase, blackout lights, etc. I only need lights and plugs (120v/12v). I will reuse the applicable wiring and remove all the wiring that will never get used. It was a LOT of wiring. The screws to take all that down amounted to about 300 or more screws.
Then I removed the wall panels, took the old insulation out and put in closed cell, foil backed insulation. The old fiberglass holds water and I wanted to fix any rust that was in there. I had very little rust to fix, which was nice. I also drilled weep holes in all end panels. The side has them, the ends do not. Weird. They need them. One panel was holding water but had not rusted out. Mostly surface rust that was easy to fix. I also painted the back sides of the wall panels with a water resistant primer so just in case water does leak back there, it will not ruin the wall panels. It won't get held by the insulation either and any water will drain out the bottom weep holes. I replaced all the wall screws with new screws. It took a little over 400 screws. I am going to spackle the walls, sand them down smooth and then paint them. Along with the ceiling wood panels.
More pics in a little bit.
Here is the truck as I picked it up.
Here is the van extended.
I am taking out the ducting, lights and unnecessary wiring. The A/C ducting takes up about four inches of head room. It did not come with an A/C installed and I didn't want to use the ducting anyway. The florescent lights take way to much energy to run so I will be swapping them with LED lights. The van is setup for 3phase, blackout lights, etc. I only need lights and plugs (120v/12v). I will reuse the applicable wiring and remove all the wiring that will never get used. It was a LOT of wiring. The screws to take all that down amounted to about 300 or more screws.
Then I removed the wall panels, took the old insulation out and put in closed cell, foil backed insulation. The old fiberglass holds water and I wanted to fix any rust that was in there. I had very little rust to fix, which was nice. I also drilled weep holes in all end panels. The side has them, the ends do not. Weird. They need them. One panel was holding water but had not rusted out. Mostly surface rust that was easy to fix. I also painted the back sides of the wall panels with a water resistant primer so just in case water does leak back there, it will not ruin the wall panels. It won't get held by the insulation either and any water will drain out the bottom weep holes. I replaced all the wall screws with new screws. It took a little over 400 screws. I am going to spackle the walls, sand them down smooth and then paint them. Along with the ceiling wood panels.
More pics in a little bit.
Last edited: