Still working on the piping, need to finalize a few hoses and then get the 240V electrical wired.
2 - 275 Gal IBC Totes, 1 for raw WMO and one for filtered
1 - 55 Gal drum for gravity feed to "fuge"
1- Northern Tools Oil Transfer Pump
1 - US FilterMaxx 3000G Centrifuge
misc pipe, valves, tubing, 5mic screen filter, fuel/water seperator & lumber
I used a 2" cross on the top bung of the drum with a double tapped 3/4" bushing in the end. The inside tap has a 2' long 3/4 pipe that extends into the drum and the top port on the 2" cross will act as a vent allowing the tank to "breath" and also is piped back to the raw tank as an overflow.
2 - 275 Gal IBC Totes, 1 for raw WMO and one for filtered
1 - 55 Gal drum for gravity feed to "fuge"
1- Northern Tools Oil Transfer Pump
1 - US FilterMaxx 3000G Centrifuge
misc pipe, valves, tubing, 5mic screen filter, fuel/water seperator & lumber
I used a 2" cross on the top bung of the drum with a double tapped 3/4" bushing in the end. The inside tap has a 2' long 3/4 pipe that extends into the drum and the top port on the 2" cross will act as a vent allowing the tank to "breath" and also is piped back to the raw tank as an overflow.