- 481
- 1,115
- 93
- Location
- AL
Not communications but rather structural.
My next project is to install the tunnel plywood which is missing from my M1097A2. It must have originally been in a 2-man configuration but is now a 4-man soft top. There are 10 1/4"x28 rivnuts already installed between the dog house and the B pillar. I need to install a few more pairs between the B and C pillars. Does anyone know if the structural cross members/channels, between B and C pillars, are open and free of obstructions? I have not been able to determine the answer from looking at the TM's.
Thank you in advance.
- HoveringHMMWV
My next project is to install the tunnel plywood which is missing from my M1097A2. It must have originally been in a 2-man configuration but is now a 4-man soft top. There are 10 1/4"x28 rivnuts already installed between the dog house and the B pillar. I need to install a few more pairs between the B and C pillars. Does anyone know if the structural cross members/channels, between B and C pillars, are open and free of obstructions? I have not been able to determine the answer from looking at the TM's.
Thank you in advance.
- HoveringHMMWV