ygmir
New member
- 300
- 0
- 0
- Location
- northern CA
Hi all,
I came up with an idea, and, it seems to work pretty good.
I thought I'd post it and see what you all think, or, can add to it......
I cut my slave cables, and, installed the twist connectors for welding cable on each end.....
now, using my welding cables, I can have 100 feet of slave if needed.....
It's sure nice to be able to pull up behind another MV and have enough cable to go all the way to the front. or, over a couple of logs to get to it.......
Just wondering what you all think, or, am I crazy (again)......
Henry
I came up with an idea, and, it seems to work pretty good.
I thought I'd post it and see what you all think, or, can add to it......
I cut my slave cables, and, installed the twist connectors for welding cable on each end.....
now, using my welding cables, I can have 100 feet of slave if needed.....
It's sure nice to be able to pull up behind another MV and have enough cable to go all the way to the front. or, over a couple of logs to get to it.......
Just wondering what you all think, or, am I crazy (again)......
Henry