Can anyone please show me with pics, how you are making your load banks ? I am ready to plug to house, but would prefer to load test the generator first before hooking up an unproven generator to my house. Seeing as I value my house and all. I would like to run a lead off the lugs to a bank of fused outlets. Then i'll use cheap heaters and hair dryers to progressively add load until satisfied. I'm having a hard time picturing how to run off the lugs, thru fuses, and into outlets. I'd like to have a fairly balance load so that matters.
Also ordering new valve cover gasket for 002a from a member here. I would like to check valve lash before I put a heavy load on her. And I plan to send my injectors to another member here to check for correct psi before I warm her up real good. I really can't imagine I have a timing problem with my IP. Everything looks beautiful and unmolested. I can't imagine it's a timing issue.
Regarding the issue with the genset not starting at 60 hz. Is that really an issue? I mean I bring it RIGHT up to 60 once she fires up? lemme know guys. Thanks
Also ordering new valve cover gasket for 002a from a member here. I would like to check valve lash before I put a heavy load on her. And I plan to send my injectors to another member here to check for correct psi before I warm her up real good. I really can't imagine I have a timing problem with my IP. Everything looks beautiful and unmolested. I can't imagine it's a timing issue.
Regarding the issue with the genset not starting at 60 hz. Is that really an issue? I mean I bring it RIGHT up to 60 once she fires up? lemme know guys. Thanks