Good Morning Folks I wanted to let you know that yesterday at noon I started removing the 4 primary comm cabinets in my S-280, here is a step by step on how it went and I rpomise to have pictures on Monday!
First step is to drill ALL Rivets associated witht he cabinet, they are all along the edges around the cabinet and this is done from inside the shelter. When I say Drilling the rivets I am not just saying to drill the head pops free, you need to DRILL them OUT, on average I would guess I drilled from and 1 to 2 inches deep on each rivet! Next get your ladder out and drill (in the same manner) all the rivets associated with your cabinet to be removed outside, these rivets are on the inside of the outside frame and the rivets again are all along the INSIDE frame, they span out from the frame of the cabinet. Next go back inside the 280 and remove any sealant from around the cabinet and use a strong putty knife to work all along the edges loosening up anything that may be left holding it in place, after this is done go outside again and Somewhat gently with a 4 or 5 pound hammer start working around the edges and in my case I was BEYOND PLEASED when the whole cabinet popped loose and I just pushed it onto the inside floor of the shelter, completed all 4 of them in under 5 hrs and only 2 more smaller ones to go! Another git of info is to remove as much stuff from inside that cabinet before perfroming this task, it seems to just make life in the drilling process a lot easier! Note folks this is MY 280 and I found NO adhesive and all my rivets were aluminum! Take your time and be gentle with the hammer I was very pleasantly surprised! Pics will be posted on Monday it went so well they will be a little boring I am happy to say! Have a great weekend
KK