The outside mainly needed some paint and the seats needed fixed. The biggest and ongoing part ofthis is the shelter interior. It was a gutted and mildewed mess, but the power wiring was fairly complete with only a few items toasted. It had to be scrubbed with lysol, then detergent, lysol, detergent, then alcohol before repaininting the inside. There was even a critter nest of some kind inside the desk under a drawer. The pictures show how filthy it was and then the progress so far, just a small part of it. Progress is slow because of alot of projects around here but after 4 years now all the radios work and the communications can be set up on as many as 5 frequencies at once without too much trouble in about an hour. The most I have ever used at once was 3. The wiring is still real messy because I need to bring all the antenna connections to one external panel and dress the power and RF cables.