- 7,744
- 154
- 63
- Location
- Columbus Georgia
Got the section ground down so we could have a level surface for the re-enforcement piece (using what we had cut out) cleaned up the mating surfaces - laid out the bonding material and clamped her in.
Worked on the window sections cutting out where the seal slips over - rounded off these sections as well.
Started sanding down what I could working in between getting stuff done in the K as well.
Hey Swiss - your holes on the side are MIA.
Worked on the window sections cutting out where the seal slips over - rounded off these sections as well.
Started sanding down what I could working in between getting stuff done in the K as well.
Hey Swiss - your holes on the side are MIA.