- 198
- 276
- 63
- Location
- Flagstaff, Az
Picked up a MEP-802A off GL in Lockbourne in January with 500hrs. No signs of water damage on the muffler or in the crankcase. Turning
the fan turns the engine (only moved it a little, not to scrape the cylinders until I get some oil in there). The only obvious damage was a broken drain wellnut on the tank. I replaced that with the brass tank fitting/O-rings.
I checked the quad windings (all ok) and installed the varistor and fuse.
I have the cylinders soaking in Marvel Mystery oil while I go through the rest of the machine. (Had some minor signs of wet stacking).
This generator was fitted with a remote control, using two timer relays. Most of the wires on the S1 switch were disconnected, and wired
through an added terminal strip to the remote-control relays. Since I don’t plan on using the remote, I plan on reconnecting the S1 switch per the wiring diagrams in the TM. I have heard that there are some errors in the TM’s.
Are the wiring diagrams for the S1 switch correct? Or do I need to look out for any surprises?
Are there any schematics available for the A1 voltage regulator? Hopefully I won’t need it, but would like to have it, in case the regulator ever
fails. The regulators seem to be virtually unavailable.
This generator came bolted to an apparently custom made aluminum frame and baseplate about 3" larger than the outline of the generator. Any idea what that was for?
Diesel fumes and CARC paint are apparently addicting. All I wanted was a MEP-016D. That turned into two, then an M-1102, and now a MEP-802A. What’s next???
Thanks to all members for the excellent postings. This has definitely made my project that much easier.
the fan turns the engine (only moved it a little, not to scrape the cylinders until I get some oil in there). The only obvious damage was a broken drain wellnut on the tank. I replaced that with the brass tank fitting/O-rings.
I checked the quad windings (all ok) and installed the varistor and fuse.
I have the cylinders soaking in Marvel Mystery oil while I go through the rest of the machine. (Had some minor signs of wet stacking).
This generator was fitted with a remote control, using two timer relays. Most of the wires on the S1 switch were disconnected, and wired
through an added terminal strip to the remote-control relays. Since I don’t plan on using the remote, I plan on reconnecting the S1 switch per the wiring diagrams in the TM. I have heard that there are some errors in the TM’s.
Are the wiring diagrams for the S1 switch correct? Or do I need to look out for any surprises?
Are there any schematics available for the A1 voltage regulator? Hopefully I won’t need it, but would like to have it, in case the regulator ever
fails. The regulators seem to be virtually unavailable.
This generator came bolted to an apparently custom made aluminum frame and baseplate about 3" larger than the outline of the generator. Any idea what that was for?
Diesel fumes and CARC paint are apparently addicting. All I wanted was a MEP-016D. That turned into two, then an M-1102, and now a MEP-802A. What’s next???
Thanks to all members for the excellent postings. This has definitely made my project that much easier.