goldneagle
Well-known member
- 4,537
- 1,067
- 113
- Location
- Slidell, LA
I installed the 2 Red LED marker lights today. That finishes the marker light installation. Will paint the housings when the weather is warmer.
Second item on my list today was the coolant filter installation. I cut a 14" long piece of 2 by 2 angle. (leftover from the shelving inside the M109 box.) Drilled 2 holes that will be used to attach it to the personal heater support. I sanded, primed and painted the angle. I cut a 3" long piece of scrap aluminum angle and drilled 5 holes in it. (3 for the filter mount and 2 for attaching to the other angle. I attached the 14" long angle to the heater support using 1 existing bolt and 1 new one. I then attached the 3" long angle to the long angle. Then I attached the filter mount and filter. I installed two 5/8" 90 degree barbed fittings to the filter housing. I cut and installed both heater hoses to the barbed fitting and clamped them in place. I took pictures of the finished project.
Second item on my list today was the coolant filter installation. I cut a 14" long piece of 2 by 2 angle. (leftover from the shelving inside the M109 box.) Drilled 2 holes that will be used to attach it to the personal heater support. I sanded, primed and painted the angle. I cut a 3" long piece of scrap aluminum angle and drilled 5 holes in it. (3 for the filter mount and 2 for attaching to the other angle. I attached the 14" long angle to the heater support using 1 existing bolt and 1 new one. I then attached the 3" long angle to the long angle. Then I attached the filter mount and filter. I installed two 5/8" 90 degree barbed fittings to the filter housing. I cut and installed both heater hoses to the barbed fitting and clamped them in place. I took pictures of the finished project.
Attachments
-
85.7 KB Views: 77
-
83.2 KB Views: 68
-
76.3 KB Views: 69
-
80.5 KB Views: 62