- 8,539
- 2,758
- 113
- Location
- Monrovia, Ca.
Well, didn't see a halftrack forum, figured this would be the best place to start this.
A guy that knows Craig...the Museum Curator..has a halftrack. An M3A1. A USN Cheif and Mine Man . He drove the Pee Pee out of it. I think a bit of too much driving and not enough maintenence took it's toll on the rt rear idler. The bearing took a dump, cocked the idler and has worn the giudes to a razor sharp state. I have been hired to repair the idler, do the rear brakes, fix a gear oil leak at the rt side drive sprocket..probably a wheel seal, re track it and re install the winch PTO and driveshaft. Should be a fun project, it will put some of the Museum projects on hold for a bit, but this was arranged by Craig and it will be done at his place since he has a f-lift and I don't. I'd like to thank Craig for thinking of me . This will help out due to the taking days off of work w/o pay.
Here are a few starter pics. Some of the halftrack and some of the replacement track and parts. The halftrack is at the Museum, The M725 is almost complete, just gotta set the valves and finish the stenciling then the halftrack will go into the shop and the work can start
A guy that knows Craig...the Museum Curator..has a halftrack. An M3A1. A USN Cheif and Mine Man . He drove the Pee Pee out of it. I think a bit of too much driving and not enough maintenence took it's toll on the rt rear idler. The bearing took a dump, cocked the idler and has worn the giudes to a razor sharp state. I have been hired to repair the idler, do the rear brakes, fix a gear oil leak at the rt side drive sprocket..probably a wheel seal, re track it and re install the winch PTO and driveshaft. Should be a fun project, it will put some of the Museum projects on hold for a bit, but this was arranged by Craig and it will be done at his place since he has a f-lift and I don't. I'd like to thank Craig for thinking of me . This will help out due to the taking days off of work w/o pay.
Here are a few starter pics. Some of the halftrack and some of the replacement track and parts. The halftrack is at the Museum, The M725 is almost complete, just gotta set the valves and finish the stenciling then the halftrack will go into the shop and the work can start
Attachments
-
96 KB Views: 214
-
93.1 KB Views: 201
-
77.8 KB Views: 216
-
86.4 KB Views: 208
-
70.6 KB Views: 206
-
64.6 KB Views: 215
-
101.4 KB Views: 224
-
71.8 KB Views: 206