So the priority list is as follows:
1. Get back to conti-US
2. Finish 5.9kW solar panel install on garage to beat June deadline of utility company
3. Replace all 12 torque link ends, both axles are currently held in place with ratchet straps
4. Engine/trans swap
We just passed the one year mark of getting the engine, I think I made good progress, resealing, converting it to 24v, trans change on it, Jake addition, turbo relocate, etc....
But you’re right, I wish it was in already too. Stay tuned, and most importantly, keep the comments heading this way! Love it. If anybody wants a shirt from here, PayPal me $20 and your size. Great for poker games.