joeblack5
Active member
- 256
- 244
- 43
- Location
- State College PA
I have 3 mep 802. One to run, Another as a backup, larger loads or if number one failes. three as parts unit for 1 and 2.
you could tie the cooling systems together as to keep the second one on temp if desired.
later j
you could tie the cooling systems together as to keep the second one on temp if desired.
later j