Already have them all printed out and in a binder. all but the one maintenance manual that's over 700 pages. I've got it on my hard drive and should be ok with that. I do have smaller backup generators and solar battery bank if i need powerPlease don't leave for the boonies without a hard copy of the manuals. Its difficult enough in the lower 48 obtaining things....up there will be rough.
unit will be powering a salmon processing facility. not a terribly large one but i need the startup power for the walk in freezer. Freezer uses i think 35 amps on startup then drops considerably. everything else should run no problem(lights, water pumps, vacuum packer, etc...) Having too much power is a bit of a concern so in order to combat wet stacking i plan on powering my cabin on it as well as charging a battery bank (for cabin power) for when the generator isn't running.What are you running that you need a 10kw generator? Thats prety far out there for a/c or an electric water heater.
Please define what fluctuations means to you.
Have you mesured/ tested your hertz reading with an independent meter?
Current remains the same in a series circuit. The circuit being out of the gen, through your load and back to the gen. Its a simple seris circuit and either hot leg will give you the total current being drawn.so to calculate the load i would then add them all up? so in your instance you were drawing a little over 106? that can't be right