- 14,635
- 4,793
- 113
- Location
- Buchanan, GA
Does that suggestion include your offer to go through 11,300+ threads one by one to sort them out? There is no automated process to achieve this, nor could there be. Also, one would have to be able to judge what would be "factory" and what would need to be in "hot-rodding". Spending around 2 minutes per thread to sort, would be 377 hours currently. Or 16 days non stop 24-7. Or if you thought of it as a 8-5 job with a hour lunch and breaks, 3 months of work.I agree that the 5ton forum should be split up. With the influx of m900 series 5tons it is making it more and more difficult to figure out what series of truck is being discussed.
I personally own a 65 kaiser m52a2. It seems that it used to be much easier to find the information i was seeking before the section got flooded with all of the newer iron.
Not trying to be rude about it, just trying to explain why it's all jumbled together. Then there's the fallout that comes from people not posting in the right area from that point on. Actually I need to trim the forums down and fold a few into each other.