no pics of this weekends work, (nothing really to show..)
I started out the work with a trip to the local ER.. I decided that I didn't need my left pointer finger anymore, and tried to cut it off with a VERY sharp razer knife.. (in other words, i was cutting some foam, and the knife slipped) the finger should be ok, the Doc said I will have a nasty scar, but nothing lasting.. (thankfully)
but after we got back (Matt drove me to the ER) we got a couple hours work into the camper.. we installed a 100A single phase main breaker box, and ran 90% of the wireing.. next step is the ceiling, and plumbing..
its getting to be crunch time!! one month to haspin!!