Hows the ankle monitor and house arrest going????
Actually started working on the truck again this week. Then it was 92 degrees so I had to go to the beach.
Now it's in the 30's and Homey don't play in dat shitz...
New shower pan is fitted and I have one minor adjustment left to the back wall piece. Once that's done I have one cabinet to build and mount (it will be for toiletries, towels, etc). Then I have to sort out how I'll be stowing the toilet itself. So far, keeping it simple with a box that the toilet slides out of. I have a bunch of stuff drawn up, but I want to get the shower done (Spring Break is only three weeks out and somebody has to be out there making sure those drunk girls get back to their rooms eventually).
I don't know why this is taking so long.
;p