jrou111
New member
- 699
- 1
- 0
- Location
- Birmingham, AL
So I'm thinking about bobbing one of my deuces, and I've got the steps down to:
1. Jack up rear, support with blocks.
2. Remove rear axles, cut out rivets, chop up frame.
3. Bolt in M105 springs/mounts onto frame using grade 8 hardware.
4. Bolt on axle to springs, attach driveshaft/brake lines.
5. Install M105 bed or cut down stock one.
Anything I'm missing here?
Here's some of the tools I have for this job:
1. 3 ton floor jack
2. 2 x 10 ton bottle jacks
3. 2 x High lift jacks
4. 2 ton engine hoist (cherry picker)
5. 4" and 9" angle grinders and flap discs, wirebrush, etc
6. 40amp Plasma cutter
7. 60gal 240v 15cfm@90psi compressor
8. Lots of airtools (impacts, chisel, etc.)
9. Crappy 120v 90amp welder (but I learned to stick weld on it)
Is there anything else I would need to bob a deuce? The only thing I can think of is a better welder, which I could always rent one.
1. Jack up rear, support with blocks.
2. Remove rear axles, cut out rivets, chop up frame.
3. Bolt in M105 springs/mounts onto frame using grade 8 hardware.
4. Bolt on axle to springs, attach driveshaft/brake lines.
5. Install M105 bed or cut down stock one.
Anything I'm missing here?
Here's some of the tools I have for this job:
1. 3 ton floor jack
2. 2 x 10 ton bottle jacks
3. 2 x High lift jacks
4. 2 ton engine hoist (cherry picker)
5. 4" and 9" angle grinders and flap discs, wirebrush, etc
6. 40amp Plasma cutter
7. 60gal 240v 15cfm@90psi compressor
8. Lots of airtools (impacts, chisel, etc.)
9. Crappy 120v 90amp welder (but I learned to stick weld on it)
Is there anything else I would need to bob a deuce? The only thing I can think of is a better welder, which I could always rent one.