I replaced all of the clutch fibers, clutch springs, water pump gasket, right case gasket. Then cleaned the oil screen (looked pretty good), threw on a Eagle mike oil fill plug, the shift linkage (elongated version), eagle mike low profile magnetic drain plug, and new oil filter. I replaced all the case, water pump, and oil filter hardware to 6mm hex head stainless using anti seize. I also checked the valve specs and one was out and the rest were pretty tight. I used a form I found online to track it and a webpage to do the math for me. I ordered all 4 valve shims from Eagle Mike. Once they arrive I’ll clean up the outside of the motor, install the valves, a new cam chain tensioner gasket ,and then engine will be done. From there I’ll start laying out the harness into the frame. I really want to get this done before July. This engine is unknown to me. It’s from a totaled 2004 KLR I got a few years ago. It had about 20,000 miles on it. With the dohickey, new valve shims, fresh oil and filters, it should be good to go for some time.