Today I finished some stuff on my ATV. I built a set of floor boards and set of hand guards.
I built my floot boards from 1 inch square tubing and flat expanded metal.
I made a left and right then notched out for the brake lever.
Then I made some steel hand guards.
I bent some 11 ga up 10 inch long 6 wide. I have tabs welded to the handle bars that I have a piece of angle bolted to with my led light bar on it. So I Welded some 1/2 in rod to the angle then to the hand guards.
Sorry I forgot to lay out a nice pretty bead of weld for you guys. I do build more stuff when I'm at work but if I take and post pics it violates a contract that dad/boss signed with company he does work for. Dad owns a welding and machining shop.