thingamadigger
New member
- 14
- 6
- 3
- Location
- Hamilton, ON
I was asked by a neighbor to bid on a rather large excavating job. Hard clay soils, moving 100's of yards of dirt a 250 yard distance and backblading the fill. A large excavating firm bid on the project with their largest excavator, a full size dumptruck, and a bulldozer at the other end, three operators and millions in equipment, plus drop off and pick up at the site from semi's something like one or two days work for them in total. The question is can a SEE compete? I would be happy clearing anything over $50/hr, and doing what they could accomplish in a day, in a week(or two?) on the SEE. A dump trailer may also be in the cards as I have found one for sale local in the woods nearby. Would I have to have a few loads dug up and ready to go each time, before folding the backhoe to tow the trailer with the pintle, and then fill the trailer with the front bucket from piles; or place the trailer so that the digger bucket could load it directly, but have to do a fold each time it was full?. How many yards can I move realistically in a 8-10 hr day? What is the most efficient way?