• Steel Soldiers now has a few new forums, read more about it at: New Munitions Forums!

  • Microsoft MSN, Live, Hotmail, Outlook email users may not be receiving emails. We are working to resolve this issue. Please add support@steelsoldiers.com to your trusted contacts.

Superthermal's M813 Build, THE BOT

Superthermal

Well-known member
281
795
93
Location
Utah, Murray, United States
I have purchased 3 Detroit lockers for the axles and three sets of Konig chains for my 16.00R20s. I will be attempting to make the "track" chains discussed back a ways in my thread.
I will start installing the lockers on Monday with the help of another SS member. I need to pull my S-280 out and then remove the cargo bed. This will allow me to remove the chunks from the top through the top of the frame. The front is a bit more tricky. Will be lifting the front of the rig off the ground, removing the front tires, and resting the rear of the springs on railroad ties and some 2x12s . Ill take the drums off and the steering arms off the top of the knuckles then undo the front U-bolts. Then with some luck I can slide the axle out from under the front of the rig so the surgery can take place.
Wish me luck.
 

Attachments

Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website like our supporting vendors. Their ads help keep Steel Soldiers going. Please consider disabling your ad blockers for the site. Thanks!

I've Disabled AdBlock
No Thanks